Every component comes as a managed solution with a user manual, emailed to you as soon as payment is received.
NIRAYPCF Gallery
ManufacturingComing soon: built and tested

Engineering Change Order

ECR/ECO impact, effectivity, stock disposition, CCB approvals and implementation in one PCF control

Also in the Niray Manufacturing PCF Pack

Licence price

S$15

One-time licence
Emailed to you after payment

  • Managed solution
  • User manual (Word)
  • Canvas, Model-driven, Power Pages
  • Works on phones

  • Change list with KPIs and action-needed sorting
  • Stage gate stepper Draft → Closed
  • Impact & disposition per affected part with cost exposure
  • Effectivity by date, serial, lot or stock run-out
  • Gate validation before CCB submission
  • Sequential or parallel CCB approvals with mandatory reject comments
  • Implementation checklist by department with overdue flags
  • Phone, tablet and desktop layouts
  • Keyboard and screen-reader support
  • Outputs and DOM event for flows and scripts

More for Manufacturing

Coming soon

Manufacturing

Andon Line Board

Line-side andon calls with live timers, escalation and one-tap acknowledge/resolve – in Power Apps and Power Pages.

S$15

Coming soon

Manufacturing

Bill of Materials Explorer

Multi-level BOM with cost, quantity and lead-time roll-up, where-used and revision compare.

S$15

Coming soon

Manufacturing

CAPA 8D Tracker

Run 8D problem solving inside Power Apps – from containment to closure.

S$15

Coming soon

Manufacturing

Capacity Load Heatmap

Rough-cut capacity heatmap with what-if shift patterns and overtime

S$15